case

Explosion-Proof Electric Hoist Export Case

In Saudi Arabia and other Middle Eastern countries, the rapid development of the petrochemical and heavy industries means painting workshops often handle flammable coatings and solvents. Such environments are prone to explosive gas mixtures, making explosion-proof equipment essential.
Enterprises in this sector require lifting equipment that complies with ATEX standards, supports long-term stable operation, and adapts to low-clearance workshop structures.

asic Project Information

Product
Explosion-Proof Wire Rope Electric Hoist

Lifting Capacity
5 tons

Lifting Height
12 meters

Explosion-Proof Grade
Ex d IIB T4 Gb (suitable for Zone 1)

Control Method
Wireless remote control + Pendant control

Power Supply
380V, 50Hz, 3-phase AC

01-Project Overview

In March 2024, we successfully delivered an explosion-proof electric wire rope hoist system to an industrial painting workshop in Saudi Arabia. The hoist is used for lifting operations in areas involving flammable paint and solvents, where explosive gas mixtures are present.
As the workshop is classified as a Zone 1 hazardous environment, the client required a hoisting solution with reliable explosion-proof performance, compact structure for low headroom, and safe long-term operation.

02-Industry Background

In Saudi Arabia and other Middle Eastern countries, the rapid development of the petrochemical and heavy industries means painting workshops often handle flammable coatings and solvents. Such environments are prone to explosive gas mixtures, making explosion-proof equipment essential.
Enterprises in this sector require lifting equipment that complies with ATEX standards, supports long-term stable operation, and adapts to low-clearance workshop structures.

03-Customer Requirements

  • Compliance with ATEX standards, suitable for Zone 1 hazardous areas
  • High-level explosion-proof protection for motor and electrical components
  • Compact design for low headroom installation
  • Reliable performance under frequent, intensive operation
  • Delivery within 60 days
  • Bilingual Arabic and Chinese user manuals and remote support services

04-Solution

We provided a customized explosion-proof electric wire rope hoist tailored to the client’s operational and safety needs, featuring:

  • Certified Ex d IIB T4 Gb explosion-proof motor and control system
  • Drum-driven structure for smooth and efficient lifting
  • Compact body design to fit limited headroom installations
  • Enclosed metal casing with anti-corrosion coating
  • Spark-proof rope guide for added safety in hazardous environments
  • Supplied with ATEX and IECEx certification documents, and bilingual manuals for easy operation

05-Project Highlights

  • Full Safety Certification: Compliant with both ATEX & IECEx standards for safe operation in Zone 1
  • Rapid Turnaround: Delivered from design to dispatch in just 55 days
  • Professional Remote Support: Provided detailed video installation guidance and commissioning instructions
  • Customer Satisfaction: The hoist was highly praised for its safety, performance, and user-friendliness

Customer Compliments

Julia:
Julia:

“This explosion-proof hoist performs exceptionally well in our Zone 1 painting area. Its design ensures both safety and efficiency. We were especially impressed by the fast delivery and remote technical support. We plan to adopt this series for future production lines.”

PowerLink® After-sales service

On-site installation, commissioning, production engineers accompany the entire process and continue to help customers solve problems;

Professional consignment team, flexibly arrange the transportation and delivery of products, and share the delivery progress with customers;

Reliable online customer service team is always ready to answer customer questions and provide necessary technical support for free.

Customize Your Lifting Solutions

Tips

Scroll to Top